The Pagosa Springs Sanitation General Improvement District (PSSGID) is taking significant steps to enhance the town’s sewer infrastructure. A public hearing is scheduled for Wednesday, June 17, 2026, at 5:30 p.m. at the Ross Aragon Community Center, South Conference Room, located at 451 Hot Springs Blvd. This session aims to inform residents and gather input on three high-priority projects designed to improve the town’s wastewater management system.
Key Projects Under Discussion
- 1st Street Lift Station Installation: A new lift station along Highway 160 to bolster the sewer system’s capacity and reliability.
- Overflow Vaults and Control Modifications: Enhancements at existing lift stations to provide overflow protection during power outages and emergencies.
- Rosita Street Sewer Pipe Replacement: Replacement of Category 4 sanitary sewer pipes, including manhole and pipe upgrades, to ensure system integrity.
The estimated cost for these improvements is $3,223,000. To facilitate funding, the PSSGID has prepared a Project Needs Assessment and an Environmental Assessment, which will be submitted to the Colorado Department of Public Health and Environment to qualify for a State Revolving Fund Loan.
Community Participation Encouraged
Residents are encouraged to attend the public hearing to provide written or oral comments on the proposed projects. For those unable to attend in person, remote participation is available through Google Meet: meet.google.com/eiw-rhvs-ube. Phone access is also provided at +1 956-704-1217, PIN: 315 971 878#.
Copies of the Project Needs Assessment and Environmental Assessment are available for public review at the PSSGID office, 551 Hot Springs Blvd., and online at: mypagosa.org.
For questions, contact Karl Johnson, Sanitation Capital Projects, at 970-264-4151 ext. 262.
Community involvement is vital to the success of these infrastructure projects. Your participation ensures that the improvements align with the needs and expectations of Pagosa Springs residents.

