Pagosa Springs Advances Sewer Infrastructure with Upcoming Public Hearing

Pagosa Springs Advances Sewer Infrastructure with Upcoming Public Hearing

The Town of Pagosa Springs is taking significant steps to enhance its sewer infrastructure, addressing longstanding challenges and preparing for future growth. A public hearing is scheduled for Wednesday, June 17, 2026, at 5:30 p.m. at the Ross Aragon Community Center, South Conference Room, located at 451 Hot Springs Blvd. This session aims to inform residents and gather input on the proposed 1st Street Lift Station, Lift Station Overflow Vaults, and Category 4 and 5 Sanitary Sewer Pipe Replacement Project.

Project Overview

The proposed project encompasses three key components:

  • 1st Street Lift Station Installation: A new lift station along Highway 160 to improve wastewater management.
  • Overflow Vaults and Control Modifications: Enhancements at existing lift stations to provide overflow protection during power outages and emergencies.
  • Sanitary Sewer Pipe Replacement: Replacement of Category 4 sanitary sewer pipes on Rosita Street, including manhole and pipe upgrades.

The estimated cost for these improvements is $3,223,000. To facilitate funding, the Pagosa Springs Sanitation General Improvement District has prepared a Project Needs Assessment and, if applicable, an Environmental Assessment. These documents outline the project’s necessity, alternatives considered, proposed components, and funding strategies. They will be submitted to the Colorado Department of Public Health and Environment to qualify for a State Revolving Fund Loan.

Community Participation

Residents are encouraged to attend the public hearing to provide written or oral comments. For those unable to attend in person, remote participation is available through Google Meet: meet.google.com/eiw-rhvs-ube. Phone access is also provided at +1 956-704-1217, PIN: 315 971 878#.

Copies of the Project Needs Assessment and Environmental Assessment are available for public review at the Pagosa Springs Sanitation General Improvement District office, 551 Hot Springs Blvd., and online at: mypagosa.org/1st-st-lift-station-lift-station-overflow-vaults-and-category-4-and-5-sanitary-sewer-pipe-replacement.

For questions, contact Karl Johnson, Sanitation Capital Projects, at 970-264-4151 ext. 262.

By engaging in this process, residents can contribute to the development of a more resilient and efficient sewer system, ensuring the town’s infrastructure meets current and future needs.